Strong
business plan
Estimated Capacity
6MMscfd
QSL-GP in collaboration with NGMC completed the construction and installation of 2.5MMSCFD gas infrastructures for the supply of Natural Gas to Green Hills Agricultural Production Facility.







Feasibility Study
The entire design and planning process was surveyed by experts and certify the project was doable before work started.

Site Mobilization
The needed materials were mobilized for the immediate commencement of work and groundbreaking.

Project Completed
Installation of equipment on site and pre-testing carried out to ensure everything was in good operational condition.

Project Commissioning
The project was certified completed by the site engineer and commissioned for use by our customer.
QSL-GP Profile
We are driven with a singular goal to deliver clean, cost effective and sustainable energy solutions for power, commercial and industrial sectors within the Nigerian Clime and the African Continent.
Final Results
A duly delivered project executed in record time in adherence to the customers specified capacity.