Project info

  • Client: Green Hills Agricultural Products Limited
  • Service: Gas Connection to COPC
  • Team: Operations

Strong
business plan

Estimated Capacity

6MMscfd

QSL-GP in collaboration with NGMC completed the construction and installation of 2.5MMSCFD gas infrastructures for the supply of Natural Gas to Green Hills Agricultural Production Facility.

OS 1 (12)i
a5
DCIM100MEDIADJI_0003.JPG
a1
a2
DCIM100MEDIADJI_0069.JPG
Feasibility Study

Feasibility Study

The entire design and planning process was surveyed by experts and certify the project was doable before work started.
Site Mobilization

Site Mobilization

The needed materials were mobilized for the immediate commencement of work and groundbreaking.
Project Completed

Project Completed

Installation of equipment on site and pre-testing carried out to ensure everything was in good operational condition.
Project Commissioning

Project Commissioning

The project was certified completed by the site engineer and commissioned for use by our customer.

QSL-GP Profile

We are driven with a singular goal to deliver clean, cost effective and sustainable energy solutions for power, commercial and industrial sectors within the Nigerian Clime and the African Continent.

Final Results

A duly delivered project executed in record time in adherence to the customers specified capacity.